OPERATIONAL CHECK UP OF ESP

CHECK UP THE OPERATION OF THE PLANT BY MEANS OF INSTRUMENT AND SIGNAL LAMP IN THE RECTIFIER CONTROL PANEL AND AUXILIARY CONTROL PANEL.

AT NORMAL PERATION,VOLTMETERS AND AMMETERS ON RECTIFIER CONTROL PANELS WILL FUNCTION PROPERLY AND FAULT LAMPS WILL NOT GLOW.

CHECK AT LEAST TWICE EVERY SHIFT THAT THE RECTIFIER UNITS ARE FUNCTIONING,THERAPPING MECHANISMS FOR EMITTING AND COLLECTING SYSTEMS ARE FUNCTIONING,ALL THE ASH HANDLING EQUIPMENT ARE WORKING AND DUST IS TRANSPORTED IN A PROPER WAY.

PRECIPITATOR CURRENT,PRECIPITATOR VOLTAGE,BOILER LOADIG,FLUE GAS TEMPERATURE AT THE INLET OF PRECIPITATOR AND CONDITION OF ASH DISPOSAL SYSTEM MUST BE CHECKED PREFERABLY EVERY 30 MINUTES.